PlanctoLab — Microalgae Water Treatment
Industrial water treatment facility
Deployment Framework

From water testing to full-scale installation.

Every deployment starts with data. Our phased pilot framework de-risks biological treatment by validating performance at each stage before scaling — so you invest with confidence, not assumptions.

biotech
Phase 01

Water Testing

We analyze your effluent chemistry, microbiology, and flow variability to identify the optimal biological treatment strategy.

precision_manufacturing
Phase 02

On-site Pilot if Needed

A compact bioreactor is deployed at your facility to validate removal rates and biomass yield under real operating conditions.

factory
Phase 03

Full-scale Installation

A larger-scale installation designed around the site's treatment needs, operating framework, and project objectives.

energy_savings_leaf
Phase 04

Optimize and Valorize

After installation, the system can be monitored, refined, and improved over time based on operational feedback and performance data. Depending on the project, this stage may also include selected biomass valorization pathways.

Industrial bioreactor pilot in operation
Industrial Context

Precision Biology. Industrial Scale.

Our pilots are not lab demos. They operate under real hydraulic loads, variable influent chemistry, and industrial operating schedules. Each system is instrumented with sensors feeding performance dashboards.

water_drop
High Nitrate Removal Observed
speed
Phased deployment timeline defined per project.

DeploymentReady.

Readyto initiate?

Tellusaboutyourwaterchallenge.Wewillscopeapilot,definesuccessmetrics,andshowyouwhatbiologycandoatyoursite.

Test,validate,scale.